What the archive says
The archive contains exactly one dome build estimate β and it's a wide DIY range, not an itemised budget.
That $15,000β$40,000 AUD figure came out of the engineering chat as a rough all-in cost for a DIY hybrid funnel + atmospheric-water-generator build β "more if properly engineered." It's the only dome-cost number anywhere in the archive.
What the archive does NOT have
There's no detailed bill of materials β no per-component prices, no itemised 6 m-prototype budget, no quotes. So this page is where that gets built: the tracker below turns the vague $15β40k range into a real, line-by-line budget you fill in as you go.Big cost drivers flagged in the engineering notes: the cooling / AWG system (compressors are the expensive, power-hungry heart) and the solar + battery needed to actually run it (realistically 15β30 panels + a large battery bank, far more than the few panels in the renders).
Now itemised on the Schedule
The vague $15β40k range has since been turned into a real day-by-day plan: β$19,960 (~$200/day) β about $15.7k materials (incl. ~$5k steel conduit across the three frame weeks) + ~$4.3k equipment hire. The by-week breakdown, order-ahead timeline and hire schedule are on the Schedule dashboard.Build budget tracker
Fill in your own estimated and actual costs per part. Totals update live and check against the archive's $15kβ$40k envelope. Saved in this browser. The line items are a starting structure β edit names, add rows, delete what you don't need.
| Part / category | Estimated $ | Actual $ | Notes | |
|---|---|---|---|---|
| Total | $0 | $0 | ||
The other costs
The dome build isn't the only spend. Here's where the rest sits β most already covered elsewhere on the site.
| Cost area | Status / figure | Where |
|---|---|---|
| Hiring help | 3-people-24/7 β $270kβ$350k/yr (not viable); lean options $30kβ$120k/yr; contractors $300β800/day | Business |
| Cameras & gear | Mostly already owned (Panasonic, GoPro, Osmo, glasses cam, DJI Mini 5, Hollyland + HDMI switch) | Gear |
| Website & hosting | Domain + hosting (keep it minimal β don't overbuild) | Launch |
| 24/7 stream | Streaming software self-built (no SaaS fees); needs off-grid power + connectivity | Streamer |
| Funding the build | Self-funded (~$19,960). A grant / investor / crowdfunding ask is only a possible later path to validate the 6 m prototype β not the plan | Business Β· Revenue |
Income covering it
The build is self-funded from concreting + pizza + sports cards; channel revenue sits in the background, and crowdfunding is only an optional later path if momentum justifies it. The money-in side is mapped on Revenue & Promo.The only build-cost figure from the archive is the $15kβ$40k AUD DIY estimate (from the engineering chat) and the cost-of-hire analysis (from the "cost of hire" chat, detailed on Business). The tracker's line-item categories are a planning structure β the dollar amounts are yours to enter; no component prices were invented. All entries save locally in this browser (key atmosfarm_budget_v1).