Where it came from, where it's going

Project Roadmap

One timeline that merges the four threads of Atmosfarm β€” the ten-year personal arc, the channel launch, the dome's development path, and the nine-day software build β€” so the whole project reads as a single mission. Deeper detail lives on Story, Business, Playbook and Streamer.

Life / backstory Dome build Channel Streamer app Business

🎯 The 100-Day Build

JUL 6 β†’ OCT 14, 2026

The active near-term plan: quiet pre-build prep through early July, then Day 1 = Mon 6 Jul β€” film + build (don't publish yet), get the dome frame up by the Oct 14 birthday, then launch the channel + 24/7 livestream on the day and premiere "I Built a Dome in 100 Days." The whole run is the content.

JUL 6 Β· DAY 1

Start creating

Begin filming + building. Stockpile content β€” don't publish. @atmosfarm accounts already set up.

JUL–AUG

Foundation β†’ frame

Site prep + base, then raise the geodesic frame. Intercut first airflow / Venturi / condensation prototype tests.

SEPTEMBER

Frame out + edit backlog

Finish the frame + intake/duct mock-ups. Edit the stockpiled episodes; cut the launch package β€” Ep1, the 100-days film, thumbnails, channel art.

OCT 1–13

Final push

Frame fully up, the 24/7 livestream rig set up and tested off-grid, launch videos finalised.

OCT 14 Β· BIRTHDAY πŸŽ‰

Launch day

Channel goes live with the content backlog, premiere "I Built a Dome in 100 Days," start the 24/7 livestream β€” at the birthday party.

Day 1 is Mon 6 Jul β†’ Oct 14 is exactly 100 days; quiet pre-build prep runs mid-June β†’ Jul 5. Launch strategy is build-a-backlog-then-launch: create now, publish on Oct 14. Checklist: Launch Β· cadence: Playbook Β· the film: Scripts Β· day-by-day: Schedule.

Weeks 1–4 Β· Jul
Foundation β†’ frame (fabricate, lower, upper + apex)
Weeks 5–7 Β· Aug
Air intake + downpipe system
Weeks 8–9
Water-2-air condensation + filtration
Weeks 10–13 Β· Sep
Pond/aquaponics, cover, entrance, garden beds
Week 14 Β· early Oct
Exhaust + landscaping, launch prep

Content slate: main video (Episode 1) + flagship documentary "I Built a Dome in 100 Days" + 14 weekly build videos + 14 weekly timelapses + a full-build master timelapse (all on Main) + 20 topic videos + trailer + Vision video. Cadence: launch β†’ main video + flagship + 5 topics + trailer + Vision; then the 14 build videos (each with its weekly timelapse) at 2/week to year-end, topics 1/week, and the master timelapse in the month after launch.

~20 yrs β†’ now

The back-story arc

The condensed life timeline that led here β€” full version on My Story.

June 2026 β€” now

Now β€” restarting out loud

Two things are happening in parallel right now: the channel is being launched, and the software to run it was just built.

The guiding rule

Launch fast, upload first, don't disappear into website/branding/gear perfection. Start small and portable because the property may be developed within ~2 years β€” everything has to be able to move.
Next β†’ long-term

The road ahead

Where the dome build and the channel/business are heading once the engine is running.

Synthesised from the life-story timeline (main covo / Episode 1), the channel launch phases + posting schedule (main covo / Project Master Document), the dome development roadmap (the pitch/investor/grant decks), and the streamer build history (the YT Live Streamer site). Relative dates ("~10 years ago") are kept as they appear in the source.