How to use this
Six dated milestones from now to launch day. Click any row to mark it done — it dims, strikes through, and the check turns on; progress saves locally in this browser. The counters track how far through the whole 100 days you are. Targets are guides, not contracts — slide them if the build does.
The plan
Create from Day 1 (Mon 6 Jul) (film + build, don't publish) · frame up by the Oct 14 birthday · launch the channel + 24/7 livestream that day and premiere "I Built a Dome in 100 Days." Full timeline on the Roadmap. (Day 1 = Jul 6 → Oct 14 is exactly 100 days; quiet pre-build prep runs mid-June → Jul 5.)
Set up quietly BY JUN 30
Before Day 1. Get identity, gear and materials ready so Day 1 (Mon 6 Jul) is pure creating. Keep it quiet — accounts exist, nothing is published.
Identity & workflow
Priority: very highDon't overbuild
Clean, minimal landing page only. Set the accounts up, then stop polishing and go build.Build & gear prep
Start creating JUL 6 · DAY 1
The clock starts. Roll cameras and break ground the same day — Day 1 is the cold open of the whole series. Film everything, publish nothing.
Foundation → frame JUL–AUG
The build months. Base in, geodesic frame going up, prototype tests intercut, and a steady stream of footage banked. Keep editing as you go so the backlog doesn't pile up.
Frame out + edit the backlog SEPTEMBER
Lock the build, cut the launch slate. Finish the frame and turn the summer's footage into a publishable run of episodes — including the flagship film.
Finish the frame
Edit the launch package
Final push OCT 1–13
Launch prep. Frame fully up, the 24/7 stream proven off-grid, every launch video finalised and scheduled, and a run sheet for the day.
Launch day OCT 14 · BIRTHDAY 🎉
Everything goes live at once — the backlog, the 100-days film, the livestream and the announcement — at the birthday party.
Mindset
Don't
Wait for perfection · Overscript · Overdesign the website · Overcomplicate branding · Buy too much gear · Disappear into planning.Do
Upload · Document · Test · Iterate · Stay authentic · Keep momentum.The real goal isn't "build the final Atmosfarm" — it's START THE ENGINE: launch the channel, establish identity, build workflow, create momentum, prove consistency, begin documenting.
Re-seeded as dated milestones tied to the 100-Day Build plan (Day 1 = Mon 6 Jul → Oct 14, 2026). Task content reconstructed from the "main covo" digital to-do list; dates and the dome-frame / launch-day milestones added from the creator's plan. Was reset to a fresh checklist (storage v2) when re-dated.